Item |
Year |
Project |
Client |
Service |
1 |
1989 |
150 Nos. Stainless Steel Water Storage Tanks for Fire Rescue Trucks |
CME/BOMBA MALAYSIA |
Design and Fabricate |
2 |
1989 |
7 Nos. Stainless Steel Tanks for Airport Fire Rescue Truck |
CME/ MALAYSIA AIRPORT BHD |
Design and Fabricate |
3 |
1990 |
Design & Supply 4 units Rotary Sand Screen |
IISB/ TIOXIDE MALAYSIA |
Design and Fabricate |
4 |
1990 |
Installation, Testing & Successful Commissioning of Mentor-26 Storage Tank and Associated Works for EMB at Kemaman |
SUMATEC CORPORATION SDN BHD |
Tankage & Piping, C&S |
5 |
1990 |
Peninsular Gas Utilisation Project II Gas Transmission System for Ancillary Civil and Building Works (J.V with Algotech (M) Sdn Bhd |
MMC GAS SDN BHD |
Civil, Building Pipeline & Infrastructure |
6 |
1991 |
Design & Supply 8 Nos. Storage Tank c/w Agitator and Motors |
IISB/BASF |
Design and Fabricate |
7 |
1991 |
Fabrication of 8 Nos. Pressure “U STAMP” for BASF Plant in Gebeng |
IISB/BASF |
Fabrication |
8 |
1991 |
Supply 10 Nos. Shell & Tube Heat Exchanger for PEC |
IISB/PEC |
Fabrication |
9 |
1992 |
7 Nos. Stainless Steel Water & Foam Storage Tanks for Petronas Refinery, Melaka |
CME/PSR |
Design and Fabricate |
10 |
1992 |
Design and Fabricate 1 Lot Pipe Support |
IISB/MTBE |
Design and Fabricate |
11 |
1992 |
Design, Fabricate & Set up Mixing Tank & Piping Works for Malaysia Explosive Plant |
SME |
Design and Fabricate |
12 |
1992 |
Supply & Fabricate 2 Nos. Reactor for Dyno Industries Singapore |
IISB/DYNO INDUSTRIES |
Fabrication |
13 |
1993 |
Supply & Fabricate 6 Nos. Clad Material Vessels for Sarawak Shell |
IISB/ SARAWAK SHELL |
Fabrication |
14 |
1993 |
Fabrication & Installation work and Lateral Gas Pipeline for Petronas Gas Sdn Bhd City Gate Station at Pasir Gudang, Seremban and Port Klang |
KRISIS SDN BHD |
Pipeline |
15 |
1994 |
Fabricate & Site Erection 2 Nos. Polymerization Reactor for Polyethylene Plant, Kerteh |
KNM/ TECHNIP |
Fabrication |
16 |
1994 |
Gas Dehydration for Dew Point Control Unit at Kertih-GPPI Plant |
NATEC CORPORATION SDN BHD |
Piping |
17 |
1994 |
Mechanical Installation & Piping Works for EMSB Enthane & Fuel Gas Pipeline and Metering Facilities at Kertih |
KNM STEEL CONSTRUCTION SDN BHD |
Piping |
18 |
1994 |
Fabrication & Installation all Equipment for 2 Nos. Skid Filters & Chemical Injection Skid |
IISB/ PETRONAS |
Fabrication |
19 |
1995 |
Construct 1 Lot Pressure Vessels for Sarawak Shell Bhd.
|
KNM/ SARAWAK SHELL |
Fabrication |
20 |
1995 |
Design & Supply Water & Foam Tank for Fire Rescue Trucks for TNB/MINDEF |
CME |
Design & Fabricate |
21 |
1996 |
Installation of 2” Hydrogen Pipeline at Amoco Plant, Kuantan for Sitt Tatt Industrial Gas Sdn Bhd |
FIELDWORK ENGINEERING SDN BHD |
Pipeline |
22 |
1996 |
Construct 8 Nos. Cargo Tank for P.T.Dok & Perkapalan, Indonesia. Diameter 7.5m. |
KNM |
Fabrication |
23 |
1996 |
Fabricate 2 Nos. LPG Mounded Vessels for Tawau LPG Bottling Plant. Diameter 8.0m. |
KNM/ PETRONAS |
Fabrication |
24 |
1997 |
Fabricate 2 Nos. Butane Storage Tanks for Petronas Melaka Refinery. Diameter 6.0m. |
KNM/ PETRONAS |
Fabrication |
25 |
1997 |
Construct 2 Nos. KO Drum for Petronas Melaka Refinery. Diameter 4.0m. |
KNM/ PETRONAS |
Fabrication |
26 |
1997 |
Fabrication & Erection Main Mast Structure for National Swimming Pool Sport Complex, Bukit Jalil |
KNM/ACPI |
Fabrication & Erection |
27 |
1997 |
Design & Supply Pipe Support for SSAA-3, Kapar Power Plant |
EESB |
Design & Fabricate |
28 |
1997 |
Design & Supply 1 Lot Structural Steel Support for KLIA Project |
JUTASAMA |
Design & Fabricate |
29 |
1997 |
Design, Fabricate & Erection 2 Factory Lot for ACPI Gurun Plant |
ACPI |
Design & Fabricate |
30 |
1997 |
Fabricate 2 Nos. Mercury Removal Tank for GPP-4 |
KNM |
Fabrication |
31 |
1997 |
Construct 2 Nos. Hopper for Shell Refinery, Port Dickson |
KNM |
Fabrication |
32 |
1998 |
Fabricate 2 Nos. LPG Mounded Vessel for Shell, Port Dickson. Diameter 7.0m. |
KNM |
Fabrication |
33 |
1998 |
Construct & Installation Equipment for Glycol /Regeneration Skid for Brunei Shell Stainless Steel Vessel – 2 Nos., Carbon Steel Clad with Stainless Steel 316 L – 3 Nos., Shell & Tube Heat Exchanger – 1 No. |
KNM |
Fabrication |
34 |
1998 |
Fabricate 3 Nos. LPG Mounded Vessel for Petronas Refinery Melaka. Diameter 7.0m. |
KNM/ PETRONAS |
Fabrication |
35 |
1998 |
Construct 6 Nos. Pressure Vessel for Shell Port Dickson (High Grade Vessel) |
KNM |
Fabrication |
36 |
1998 |
Fabricate 20 Nos. Vessel for Titian No.2 Cracker Plant, Johor |
KNM |
Fabrication |
37 |
1998 |
Construction of Structural Steel Piping and Mechanical Works of Glycol Contractor and Dehydration Skid Unit for Brunei Shell Project |
KNM/ DP FABRICATORS SDN BHD |
Piping, Structure, Mechanical |
38 |
1999 |
Construct & Supply 18 Nos. Pressure Vessel for KR2 Project |
TOYO ENGINEERING/ CHIP NGAI ENGINEERING |
Fabrication |
39 |
1999 |
Fabricate & Supply 4 Nos. Stainless Steel VC Dryer & 1 No. Stainless Steel Catalyst Hopper |
TOYO ENGINEERING/ CHIP NGAI ENGINEERING |
Fabrication |
40 |
1999 |
Construct 8 Nos. Bullet Storage Vessel & 2 Nos. Stainless Steel Clad Vessel for MTBE Propane Dehydrogenation Project |
AMB |
Fabrication |
41 |
2000 |
Angsi Pipeline Tie-In to Onshore Slugcatcher at Kertih & 1st and 2nd Section BGE Reactors for Buthanol Derivatives Project |
KNM STEEL CONSTRUCTION SDN BHD |
Piping |
42 |
2000/ 2001 |
Construct 2 Cells Wood Structure Cooling Tower (Induced Draft Cooling) for MLNG |
HAMON/ PETRONAS |
Installation/ Commissioning |
43 |
2001 |
Terengganu Crude Oil Terminal-Piping Vibration Project |
PETRA RESOURCES SDN BHD |
Piping |
44 |
2001 |
Complete installation of Pipework and Equipment at Seremban Site |
PETRA RESOURCES SDN BHD |
Piping |
45 |
2001 |
Procurement, Construction & Commissioning of Slugcatcher, Gas Metering Station, Spillover Line & Associated Facilities for MLNG-TIGA Pipeline Project – Procurement Fabrication, Inspection, Erection, Pre-commissioning & Commissioning of Spillover Line Subcontract |
ORBTECH ENGINEERING CORPORATION SDN BHD |
Piping |
45 |
2002 |
Installation & Commissioning 1 No. 2 Cells Concrete Cooling Tower (Induced Draft Cooling) for Petlin Malaysia |
HAMON/ PETRONAS |
Installation/ Commissioning |
46 |
2002 |
Construct 10 Cells FRP Structure (Induced Draft Cooling) for Segari Power Plant for Alstom |
HAMON/ ALSTOM |
Installation/ Commissioning |
47 |
2002/ 2003 |
OMYA Factory Wet Plant Extension. Construct Silos, Piping Works, Structural Extension & E&I Testing |
PERUNDING IBS |
EPC |
48 |
2003 |
EPCC a Pilot Plant for Converting LPG Gas to R34 Green Gas in Telok Gong, Klang |
ECOCOOL |
EPCC |
49 |
2004 |
To supply labours, tools, consumable and supervision necessary for the satisfactory completion of all piping, all structural steel and mechanical works for three skids for Betara Gas Complex Development |
KNM/DP FABRICATORS SDN BHD |
Piping |
50 |
2004/ 2005 |
Nominated as a Procurement Sub-Contractor for the Waste Treatment Incinerating Plant together with Ebara Environmental S/B |
EBARA ENVIRONMENTAL |
Service |
51 |
2005 |
Fabricate, Erect & Testing of Red Side & White Side Tanks Inclusive of Structural, Piping works, Platform & Stairways, Draft Tubes & Other Internal |
KNM OGPET (EAST COAST) SDN BHD |
Piping |
52 |
2005 |
Alcan Gove Third Stage Expansion - G3 to supply all labour, consumables, tools and supervision necessary for the satisfactory completion of shop fabrication & assembly works & to perform all activity related to hydrotesting & Other Related Works Up to Delivery for the Equipment |
KNM OGPET (EAST COAST) SDN BHD |
Piping |
53 |
2005 |
Construct approx. 1500 mt of structural steel for Heat Recovery System Generator |
TEPAT TEKNIK |
Fabrication |
54 |
2006 |
Drum 1 & Pre-reactors For Rabigh Olefin Plants Project |
KNM PLANT (MELAKA BHD) |
Piping |
55 |
2006 |
EPCIC of Onshore Domestic Gas Facilities Upgrading Project, Myanmar Completion of All Piping, All Structural Steel & Mechanical Works for 2 units Skids |
MKE ENGINEERING SDN BHD |
Piping, Structural & Mechanical Work |
56 |
2006 |
15 Drums-1 (Clad/Superduplex) & Epoxy Pre-Reactors for Rabigh Plants, Saudi Arabia (Sumitomo) |
KNM PLANT (MELAKA BHD) |
Piping |
57 |
2007 |
Fabrication, Erection & Testing of MG3 Storage Tanks at Unit 49 & 72 (11 Tanks in Melaka) |
MUHIBBAH PETROCHEMICAL ENGINEERING S/B |
|
58 |
2007/ 2008 |
Fabricate & Supply 2 Nos. Production Separation Tank for Sumandak Oil Field Project |
OGPP/ PETRONAS |
Fabrication |
59 |
2008 |
K0803032 -13 Regeneration Gas Skids, & Assembly for PAGMI Phase 1, Venezuela Prosernat |
KNM OGPET (EAST COAST) SDN BHD |
Piping & Steel Structure |
60 |
2008 |
KR 0702119 EPC Contract for 750 td, Biodiesel plant project at Kuantan Port |
KNM OGPET (EAST COAST) SDN BHD |
Piping & Steel Structure |
61 |
2008/ 2009 |
Fabricate & Supply 10 Nos. Inclusive Stainless Steel 316L Clad Material Pressure Vessels for CPOC Acid Removal Unit |
OGPP/ PETRONAS |
Fabrication |
62 |
2009 |
Fabricate & Supply 15 Pressure Vessels for Maersk Oil Qatar (MOQ) Platform. NACE Material |
OGPP/SDE |
Fabrication |
63 |
2010 |
Seconded to Matrix Cooling to Construct 10 Cells Cross Flow Cooling Tower (Concrete Structure) as Lead Construction Manager for ABF New Cooling Tower Project |
MATRIX/ PETRONAS ABF |
EPCC |
64 |
2011 |
Piping for Gas Dehydration & Glycol, Regeneration Package for SOGT Project, Malaysia |
KNM PROCESS SYSTEMS SDN BHD |
Piping |
65 |
2011 |
Construct and Built 3.5 km GRE Underground Piping for LYNAS Plant, Gebeng |
OGPP/ UGL RESOURCES |
Civil/ Installation |
66 |
2012 |
Construct and Built 2 km GRV Underground and Above Ground Piping for Petronas Carigali Turkmenistan S/B Fire Water Line and Chemical Dosing Line |
OGPP/MMHE |
Installation |
67 |
2012 |
Construct and Built 2 km GRV Underground and Above Ground Piping for Petronas Carigali Turkmenistan S/B Fire Water Line and Chemical Dosing Line |
OGPP/MMHE |
Installation |
68 |
2012 |
Installation of Auto Clave, accessories and Piping Works c/w All Associated Works for Melaka Aviation Manufacturing Plant |
SCHOLZ MACHINENBAU |
Design, Installation & Piping |
69 |
2013 |
Provide Fabrication & Installation Services for the Set-Up of the Tendon Vertical Riser VIV Model Test & Other Model Set-Up for SHELL TLP MALIKAI Deepwater Project |
TECHNIP GEOPRODUCTION |
Design, Fabrication & Installation |
70 |
2013 |
Supply, Labour, Equipment, Consumable, Hand Tools to Carry Out Steel Fabrication Structure Work for Screen House Project |
CHONG LEK ENGINEERING WORKS SDN BHD |
Design, Fabrication, Installation |
71 |
2014 |
Refurbishment of Four (4) Units Compactor at Kuala Lumpur Transfer Station, Taman Beringin |
TURBINE TECHNIQUE/ DEWAN BANDARAYA KUALA LUMPUR (DBKL) |
EPCC |